Rough Work (HVAC, Plumbing, Electrical & Low-Voltage)
May 23, 2023
This is a drone photo showing the rough plumbing below the basement.
![](https://howtoliveinplace.com/wp-content/uploads/2023/12/4-1.webp)
April 14, 2023
Video showing the concrete forms for the foundation being installed along with rebar reinforcement.
June 7, 2023
This is a drone video showing the joists for the 1st level being installed. The joists were installed on hangers that allowed the Idea Home to have no steps into the building.