June – July 2023
Framing
June 7, 2023
This is a drone video showing the floor joists for the 1st level being installed. The joists were installed on hangers that allowed the Idea Home to have no steps into the building.
June 13, 2023
This photo shows the entire 1st floor subfloor installed. It is held down with adhesive on to the joists with nails.
June 29, 2023
Drone video showing the framing of the home.
July 6, 2023
Drone video showing the 2nd floor fully framed.
July 17, 2023
Fully framed home including roof sheathing.
Compaction
June 13, 2023
This video shows compacting the dirt around the foundation walls. At the rear deck, garage and front patio the dirt is compacted on both sides of the foundation.
Trusses
July 10, 2024
Video of the trusses being hoisted into place and secured.
July 10, 2023
Time lapse video of the roof trusses being lifted and installed at the Living In Place Institute Idea Home. It’s quite interesting to see what happened over the course of 2 hours 30 minutes being condensed down to about 25 seconds.
Stair Installation
July 10, 2023
Carefully placing the bottom set of stairs to the basement. A difficult job for two people.
July 20, 2023
Finished stairs. The opening in the middle it to accommodate a future pneumatic elevator.
Roof Membrane
July 27, 2023
Picture installing the roof membrane to protect the interior of the home from water.