Roofing & Solar
June 7, 2023
This is a photo showing the 1st floor joists in place and the subflooring being installed.
July 6, 2023
This is a video of the 2nd floor framing being installed for the Living In Place Institute Idea Home.
July 14, 2023
Installation of stairs for the Living In Place Institute Idea Home.
July 14, 2023
Time lapse video of the roof trusses being lifted and installed at the Living In Place Institute Idea Home. It’s quite interesting to see what happened over the course of 2 hours 30 minutes condensed down to about 25 seconds.
August 21, 2023
Pouring the rear deck concrete for the Living In Place Institute Idea Home.
August 26, 2023
Drone photo showing the Living In Place Idea Home front porch and garage concrete.
August 26, 2023
Drone photo of the Living In Place Institute rear deck concrete.