Rough Work (HVAC, Plumbing, Electrical & Low-Voltage)

May 23, 2023

This is a drone photo showing the rough plumbing below the basement.  

April 14, 2023

 Video showing the concrete forms for the foundation being installed along with rebar reinforcement. 

 

June 7, 2023

This is a drone video showing the joists for the 1st level being installed.  The joists were installed on hangers that allowed the Idea Home to have no steps into the building.